丰满少妇高潮惨叫久久久一,娇妻玩4p被三个男人伺候电影,久久er99热精品一区二区,亚洲国产av无码精品

Hello! Welcome to Shenzhen Jintong Display Technology Co., Ltd. (splicing screen)!
中文版 | English
News
Industry trends
What should be paid attention to when installing touch splicing screens
Number of views:1844order Release Date:2020-11-26
The installation of touch splicing screens is not like ordinary display devices, it is simply installed as soon as it is placed. The installation of touch splicing screens not only requires careful selection of the installation site, but also attention to the surrounding lighting and wiring of the installation environment. In addition, there are also requirements for the frame when choosing. Let's talk about how to install a touch splicing screen.


Selection of installation ground:


The installation ground for the touch splicing screen should be flat, as the entire system of the touch splicing screen is relatively large in both volume and weight. The selected floor also needs to have a certain weight bearing capacity. If the floor is made of tiles, it may not be able to withstand its weight. Another point is that the installation ground should be anti-static.


Precautions for wiring:


When installing a touch splicing screen, it is important to distinguish the power and signal lines during wiring and install them in different locations to avoid interference. In addition, it is necessary to calculate the length and specifications of various wires required based on the size and installation position of the entire project's screen, and calculate the needs of the entire project.


Environmental lighting requirements:


Although the brightness of touch splicing screens is very high, it is still limited, so the surrounding light in the installation environment should not be too strong. If it is too strong, the image on the screen may not be visible. Light that may enter near the screen (such as windows) should be blocked if necessary, and it is best to turn off the lights when the device is running to ensure its normal operation. Do not install lights directly in front of the screen, simply install a cylindrical light.


Framework requirements:


In order to facilitate the maintenance of touch splicing screens in the future, the frame edging must be detachable. Leave a gap of about 25mm on each side between the inner edge of the outer frame and the outer edge of the assembled wall. For large assembled walls, the margin should be appropriately increased according to the number of columns. In addition, in order to enter the box for maintenance in the later stage, the maintenance channel should be no less than 1.2m wide in principle. The detachable edge strip should be pressed 3-5mm against the edge of the screen. After the box and screen are fully installed, the detachable edge strip should be fixed at the end.


Ventilation requirements:


In the maintenance channel, air conditioning or air vents must be installed to ensure good ventilation of the equipment. The position of the air outlet should be as far away as possible from the touch splicing wall (preferably around 1m), and the air from the air outlet should not blow directly towards the box to avoid uneven heating and cooling of the screen and damage.


At the touch splicing construction site, installation and debugging should determine the cause based on the phenomenon reflected by the fault, and focus on checking the synchronization interface and transmission cable of the equipment, as well as comparing the synchronization frequency range of the signal source and display terminal. If there is ghosting in the image, check if the transmission cable is too long or too thin. The solution is to replace the cable for testing or add signal amplifiers and other equipment. If the focus is not ideal, the display terminal can be adjusted. In the face of problems, the first step is to learn to analyze in order to better solve the root cause of the problem. Through strong analysis, inspection time can be shortened. These methods are some methods and skills for debugging after installation. The installer must be skilled and good. Only professional people can do professional things


Contact Us
Address: Building B, Lihao Yongda Technology Park, No.1 Dongfang Avenue, Guangming District, Shenzhen
Phone: 0755-23576861
24-hour service hotline: 139 2371 0018

QR code
CopyRight ? 2017 Shenzhen Jintong Display Technology Co., Ltd. All Right Reserved
展開
  • Tel

  • 075523576861
QR code
а天堂中文最新一区二区三区| 久久久久人妻精品一区三寸蜜桃 | 国产精品免费无遮挡无码永久视频| 粗大的内捧猛烈进出小视频| 18禁无遮挡啪啪无码网站| 亚洲综合久久精品无码色欲| 日韩精品无码av中文无码版| 一出一进一爽一粗一大视频| 艳妇臀荡乳欲伦交换h在线观看| 久久99精品久久久久久噜噜 | 婷婷五月六月激情综合色中文字幕| 99久热re在线精品99 6热视频| 国产精品天堂avav在线| 人妻聚色窝窝人体www一区 | 亚洲av无码日韩精品影片| 欧洲精品免费一区二区三区| 国产成人精品123区免费视频| 色综合久久一区二区三区| 国产乱码精品一区二区三区中文| 久久精品国产亚洲av久| 国产精品丝袜久久久久久不卡| 中字幕视频在线永久在线观看免费| 色婷婷基地| 日日摸日日碰夜夜爽无码| a级国产乱理论片在线观看| 久久天天躁狠狠躁夜夜av| 成 人色 网 站 欧美大片在线观看| 国产精品美女一区二区三区| 狠狠色噜噜狠狠狠7777奇米| 亚洲码欧美码一区二区三区| 欧美精品色婷婷五月综合| 国产三区在线成人av| 久久人妻内射无码一区三区| 一本一道精品欧美中文字幕| 亚洲国产天堂久久综合| 国产av一区二区三区传媒| 看成年全黄大色黄大片| 久久无码专区国产精品| 国产又粗又猛又爽又黄的视频在线观看动漫| 精品视频一区二区三区在线观看| 国产午夜福利100集发布|